Project name:

Odessa Sea Commercial Port. Author's supervision: LLC "MARIN PROJECT INTERNATIONAL"

Project date:

2019 - 2020

TASK:

Lighting of sites №1,2,3,4,5,6 by floodlights on the masts of the container terminal of SE KhTO (Odessa Commercial Port of Odessa)

decision:

In this project, it was decided to illuminate playgrounds №1,2,3,4,5,6 with spotlights LED SVU-PW-06-G (240W) GRAND MAX 5000K- in the amount of 12 pieces, LED-SVU-P-W-06-К10(240Вт) GRAND MAX - in the amount of 8 pieces, and LED SVU-PW-06-K (240W) GRAND MAX 5000K - in 137 pieces on the masts of the container terminal.

LED lights installed
LED SVU-P-W-06-Г(240W) GRAND MAX 5000К LED-SVU-P-W-06-К10(240Вт) GRAND MAXLED SVU-P-W-06-К(240W) GRAND MAX 5000К

THE RESULT OF CONDUCTED MODERNIZATION:

characteristics

LED SVU-P-W-06-Г(240W) GRAND MAX 5000К LED-SVU-P-W-06-К10(240Вт) GRAND MAXLED SVU-P-W-06-К(240W) GRAND MAX 5000К

Consumed power, W

240
240240

Consumed electric power , kW/h

115
115115

Illumination on working surface, Lx

30-40-50

As a result of the work, they provided a uniform light and reached a total electricity consumption of 10 kW. Electricity savings of 60% were obtained.

other projects

Write your question and we will reply to you by e-mail

Top