Project name:

PJSC "Philip Morris Ukraine"

Project date:

January 2020

TASK:

In this project, the task was set to modernize the lighting system of the production facility "Cigarette Filter Production Shop".

decision:

In this project, it was decided to replace the existing energy-intensive luminaires with MGL-250W lamps with new LED-SVU-I-C-04-141 (75W) luminaires in the Cobay housing - in the amount of 20 pcs.

before after
МГЛ-250 Вт LED-SVU-I-C-04-141(75Вт)

...

THE RESULT OF CONDUCTED MODERNIZATION:

characteristics

before after

Consumed power, W

300 75

Consumed electric power, kW/h

55
16,5

Illumination on working surface, Lx

36
300

As a result of the modernization, the data in the table show that the energy consumption decreased by 75%, while the level of illumination increased several times.