Project name:

LLC "D LIGHT"

Project date:

August 2019

TASK:

Ergonomic LED lighting for the new production hall

decision:

In this project, it was decided to install the LED luminaires LED-SVU-IC-W-03-141 (70W) GRAND industrial workshop in the paint zone in the amount of 18 pcs and LED-SVU-IC-W-05-141 (100W) GRAND industrial 15 in the assembly area in the amount of 15 pcs.

after
LED-SVU-IC-W-03-141 (70W) GRAND LED-SVU-IC-W-05-141 (100W) GRAND

THE RESULT OF CONDUCTED MODERNIZATION:

characteristics

beforeafter

Consumed power, W

70100

Consumed electric power, kW/h

15,4
22

Illumination on working surface, Lx

250

The client is satisfied with the results of the work done, the lighting suits.

other projects

Write your question and we will reply to you by e-mail

Top