Project name:

ODO "NOVOIVANOVSKY SUGAR FACTORY"

Project date:

August 2019

TASK:

Complete modernization of the lighting of the machine mechanization workshop Maximum reduction in energy consumption. Increase the level of illumination of the work surface.

decision:

In this project, a decision was made to replace the existing luminaire with an energy-intensive DRL-250 lamp with 4-piece LED-SVU-PW-01-121 (35W) GRAND lamps, LED-SVU-IE-L-06 (45W) FORTES ( 2 * 58) in the amount of 12 pcs. And LED-SVU-F-01-121 (18W) FORTES in the amount of 6 pcs.

beforeafter
DRL-250 LED-SVU-PW-01-121 (35W) GRANDLED-SVU-IE-L-06 (45W) FORTES ( 2 * 58)LED-SVU-F-01-121 (18W) FORTES

THE RESULT OF CONDUCTED MODERNIZATION:

characteristics

beforeafter

Consumed power, W

250354518

Consumed electric power, kW/h

55
7,7
104

The client is satisfied with the results of the work done, the lighting suits.

other projects

Write your question and we will reply to you by e-mail

Top