Project name:
MAGMA LLC
Project date:
July 2019
TASK:
Modernization of lighting in the procurement and welding area. Maximum reduction in energy consumption. Increase the level of illumination of the work surface.
decision:
In this project, a decision was made to replace the existing dome lamp with an energy-intensive lamp DNaT-400 with LED lamp LED-SVU-IU-L-05-141 (85W) FORTES in the amount of 66 pcs.
before | after |
ДНаТ-400 | LED-SVU-IU-L-05-141(85Вт) FORTES |
THE RESULT OF CONDUCTED MODERNIZATION:
characteristics | before | after |
Consumed power, W | 500 | 85 |
Consumed electric power, kW/h | 110 | 18,7 |
Power saving percentage, % | 83 |
As a result of the modernization, electricity consumption decreased. The client is satisfied with the results of the work done, the lighting suits.