Project name:

MAGMA LLC

Project date:

July 2019

TASK:

Modernization of lighting in the procurement and welding area. Maximum reduction in energy consumption. Increase the level of illumination of the work surface.

decision:

In this project, a decision was made to replace the existing dome lamp with an energy-intensive lamp DNaT-400 with LED lamp LED-SVU-IU-L-05-141 (85W) FORTES in the amount of 66 pcs.

beforeafter
ДНаТ-400
LED-SVU-IU-L-05-141(85Вт) FORTES

THE RESULT OF CONDUCTED MODERNIZATION:

characteristics

beforeafter

Consumed power, W

500
85

Consumed electric power, kW/h

11018,7

Power saving percentage, %

83

As a result of the modernization, electricity consumption decreased. The client is satisfied with the results of the work done, the lighting suits.