Project name:

LLC "POLYGONAL MK"

Project date:

September 2020 - March 2021

TASK:

It was necessary to complete the lighting project for the new racetrack.

decision:

In this project, it was decided to install LED-SVU-IC-03-G (50W) SMART MAX luminaires in the amount of 11 pcs., LED-SVU-IC-02-146 (35W) SMART luminaire in the amount of 22 pcs. and LED-SVU-IC-03-146 (50W) SMART lamp in the amount of 22 pcs.

LED lights installed
LED-SVU-IC-03-G (50W) SMART MAX LED-SVU-IC-02-146 (35W) SMARTLED-SVU-IC-03-146 (50W) SMART

THE RESULT OF CONDUCTED MODERNIZATION:

characteristics

LED-SVU-IC-03-G (50W) SMART MAX LED-SVU-IC-02-146 (35W) SMARTLED-SVU-IC-03-146 (50W) SMART

Consumed power, W

50
35
50

Consumed electric power , kW/h

15
10,515

Illumination on working surface, Lx

250

We provided standard illumination and a convenient type of fixing on the luminaires, thereby avoiding the swinging of the luminaires under the roof itself in drafts. The client is satisfied with the results of the work done, the lighting is satisfied.