Project name:

PJSC "Philip Morris Ukraine"

Project date:

November 2020

TASK:

Lighting of an open parking lot in front of the factory building. Maximum reduction in energy consumption costs. Increase the light level.

decision:

In this project, it was decided to replace the existing energy-intensive luminaires with a DNaT-250 lamp with LED-SVU-SK-08-K (125 W) SMART MAX outdoor console luminaires in the amount of 4 pcs.

beforeafter
DNaT-250W LED-SVU-SK-08-K (125 W) SMART MAX

THE RESULT OF CONDUCTED MODERNIZATION:

characteristics
befor after

Consumed power,W

250 125

Consumed electric power, kW/h

120 60

Power saving percentage, %

50

As a result of the modernization, according to the data in the table, it can be seen that electricity consumption has decreased by 2 times. The client is satisfied with the results of the work done, the lighting is satisfied.