Project name:
PJSC "Philip Morris Ukraine"
Project date:
November 2020
TASK:
Lighting of an open parking lot in front of the factory building. Maximum reduction in energy consumption costs. Increase the light level.
decision:
In this project, it was decided to replace the existing energy-intensive luminaires with a DNaT-250 lamp with LED-SVU-SK-08-K (125 W) SMART MAX outdoor console luminaires in the amount of 4 pcs.
before | after |
DNaT-250W | LED-SVU-SK-08-K (125 W) SMART MAX |
THE RESULT OF CONDUCTED MODERNIZATION:
characteristics | befor | after |
Consumed power,W | 250 | 125 |
Consumed electric power, kW/h | 120 | 60 |
Power saving percentage, % | 50 |
As a result of the modernization, according to the data in the table, it can be seen that electricity consumption has decreased by 2 times. The client is satisfied with the results of the work done, the lighting is satisfied.