Project name:

PJSC '' Plemzavod Stepnoy ''

Project date:

February 2021

TASK:

Maximum reduction in energy consumption costs. Increase the level of illumination of the working surface.

decision:

In this project, it was decided to replace the existing luminaire with a fluorescent lamp MGL-250 with an LED-SVU-IC-W-05 (100W) GRAND industrial workshop in the amount of 12 pcs.

beforeafter
MGL-250LED-SVU-IC-W-05 (100W) GRAND

THE RESULT OF CONDUCTED MODERNIZATION:

characteristics
befor after

Consumed power,W

250 100

Consumed electric power, kW/h

55
22

Illumination on working surface, Lx

-
200

Power saving percentage, %

40

As a result of the modernization, electricity consumption has decreased, while the level of illumination has increased several times. The client is satisfied with the results of the work done, the lighting is satisfied.

other projects

Write your question and we will reply to you by e-mail

Top