Project name:
JSC "Slavyanskie Oboi-KFTP"
Project date:
January 2022
TASK:
Interior lighting of the production grinding shop
decision:
The task of this project is to illuminate the premises of the grinding section of the production workshop using STARK - 50W series lamps, as well as a new material warehouse using FORTES - 50W series lamps.
The grinding shop was illuminated with a smaller number of LED-SVU-U-P-03(50W) STARK-750 luminaires than was originally calculated according to the project. New material warehouse lighting with LED lamp LED-SVU-IU-L-03 (50W) FORTES in the amount of 36 pcs.
after | |
LED-SVU-U-P-03(50W) STARK-750 | LED-SVU-IU-L-03 (50W) FORTES |
THE RESULT OF CONDUCTED MODERNIZATION:
characteristics | after | |
Consumed power, W
| 50 | 50 |
Consumed electric power, kW/h
| 11 | 11 |
As a result of the work carried out, we have achieved a uniform illumination of the room of 200 Lx. The client is satisfied with the quality of products and the final result of the work, which proves his review.