Project name:
Petrol station MARSHAL
Project date:
December, 2012-May, 2013
TASK:
Maximum reduction of costs for power consumption. The increase of illumination level at TRK area and petrol station area.
decision:
It was decided to replace existing power-saving lighting units with lamp DRL-250 by LED lamps LED-SVU-A-V-02. It is also necessary replace lamps HMI-250 by LED lamps LED-SVU-S-K-02 at supports. Work was carried out at 58 objects.
before | after |
DRL-250 | LED-SVU-A-V-02 |
до | после |
ДНаТ-250 | LED-SVU-S-K-02 |